- Design and provide Quality Assurance Project Plans (QAPP)
The QAPPs conform to:
- 40 CFR Parts 50, 53, and 58
- EPA Guidance for Quality Assurance Project Plans
- EPA Requirements for Quality Assurance Project
Plans for Environmental Data Operations
- Quality Assurance Handbook for Air Pollution Measurement
Systems: Volumes I, II and IV
- Meteorological Monitoring Guidance for Regulatory
Modeling Applications
- Design and provide Standard Operating Procedures (SOPs)
The SOPs are based on:
- Manufacturers' technical manuals
- EPA Guidance for the Preparation of Standard Operating
procedures for Quality-related Documents
- Design and provide integration for site operations
- Site Selection
- System Design
- Equipment Selection
- Vendor coordination
|
 |